|
A number of large corporations throughout Russia and abroad consider SMS to be their perfect partner in systems integration and automation, for both industrial and commercial applications.
We have designed and successfully implemented over 250 major projects, including explosive and non-stop production, in power generation, oil refining, gas extraction, food and beverage and chemical sectors.
Here is the list of the most significant projects we have recently completed.
Name of project
 |
Object
 |
Period
 |
Uninterruptible Power Supply System
PDF, 256 Êá
|
Zhigulevskaya HPP |
2010-2011 |
Gas Analysis Systems of Wet-Catalysis Unit
PDF, 280 Êá
|
Syzran Refinery |
2010-2011 |
Oil-Loading Rack Automation System
PDF, 373 Êá
|
Antipinsky Refinery |
2010-2011 |
System of Group Governor of Active and Reactive Power
PDF, 354 Êá
|
Uglichskaya HPP |
2008-2010 |
Hydrounit No.6 Automated Control System
PDF, 271 Êá
|
Zhigulevskaya HPP |
2010-2011 |
Low-Pressure Compressors Automated Control System PDF, 272 Êá |
Zhigulevskaya HPP |
2010-2011 |
Hydrounit No. 2 Automated Control System PDF, 277 Êá |
Uglichskaya HPP |
2008-2010 |
Steam Turbine Information and Control System
PDF, 337 Êá |
Sakmarskaya CHP |
2008-2010 |
Gallery Pumping Stations System of Monitoring and Control
PDF, 320 Êá |
Zhigulevskaya HPP |
2008-2010 |
Hydraulic Measurement System
PDF, 467 Êá |
Aushigerskaya HPP |
2008-2009 |
Implementation of Relay Protection and Automatics at Cascade of Kubanskie HPPs
PDF, 418 Êá |
Novotroitskaya HPP and HPP-4 |
2009 |
Catalytic Reforming Unit Automation System
PDF, 373 Êá |
Novokuibyshevsk Refinery |
2008-2009 |
Polyamide-6 Automation System
PDF, 355 Êá |
KuibyshevAzot |
2009 |
Automation System of Hydrogen Production Offsite Unit
PDF, 1139 Êá |
Syzran Refinery |
2009 |
Catalytic Reforming Unit Automation System
PDF, 787 Êá |
Novokuibyshevsk Refinery |
2007 |
Active Power Group Governor
PDF, 470 Êá |
Zhigulevskaya HPP |
2005-2007 |
|